64 images in this album
Description: Pictures of the process of remodeling our kitchen and family room, including the rear bathroom (which was converted from a 3/4 bath to a 1/2 bath), and the relocation of the closet in the spare bedroom. Demolition began November 15th, 2009, and the process is expected to be complete by the end of March 2010.
We've removed two walls in the rear of the house; one between the office and the family room (which also contained a closet, the laundry area, and a large cabinet), and one in the kitchen area, which is being replaced by an island. The refrigerator and range/oven were housed in that wall, and have been relocated; the refrigerator is now next to the pantry, and the range is now with its back against the wall to the dining room.